Pi datalink office 2013


pi datalink office 2013

The PIA issue does not apply if PI DataLink installation has ever worked previously on the computer or if PI DataLink 2013 is used.
The Installation Options shown in Figure 2 shown below will appear.
Microsoft ended support and troubleshooting for 2013 versions of Office 365 on February 28, 2017.
Using PI DataLink Tip #1: Use the UI when possible.If you restart Excel and verify that the PI DataLink add-in is still checked, there should be an error dialog with a Details button.To accomplish this, simply select the desired oversized chroma key premiere pro cs5 cell range fully containing the existing PI DataLink formula array, click the formula bar, and press CtrlShiftEnter.The details provide information about why the ribbon is not being displayed.To check whether the Office 2010 PIA is installed Navigate to the Open the Windows Add/Remove Programs (or Program and Features on Windows Server 2008, Windows 7 and Vista) applet in the control panel.5 PI DataLink 2015 was tested after release and found to be compatible with Office 2016 and Windows.Using PI DataLink Tip #4: Make non-volatile PI DataLink functions volatile.Search and Browse Together, the all new search makes it easy to find PI System data based on descriptions or names of assets and points.Other PI DataLink functions only update with a Full Calculate command (CtrlShiftAltF9).) COM add-in are listed in the Active Application Add-Ins list (see.For a full list of fixes and enhancements in PI DataLink 2013, see the.Asset Centric Reporting, simultaneously search and browse the PI System.Windows Vista SP1, pI DataLink.1.1 (2014 SP1 excel 2013 (32-bit/64-bit) Excel 2010 (32-bit/64-bit) Excel 2007 SP3 PI Data Archive.4.380.36 PI AF Server.5 (2012) Windows.1 / Server 2012 R2 Windows 8 / Server 2012 Windows 7 / Server 2008 R2 Windows Vista.Note that DataLink.x and.x write the installation keys to different locations.Check out our Knowledge Base for more advanced tips and tricks We recommend the following KB articles for more PI DataLink tips and tricks.Paste the PI DataLink formula back into the formula bar, remove the " (dollar signs) from the row references and press CtrlShiftEnter.


Sitemap